国产原创麻豆,国产黄网,亚洲不卡在线,丝袜毛片,操穴网站,亚洲色欧美,国产精品九九久久一区hh

Lu'An Jietonda New Material Co.,Ltd.

Industry news

Information

Lu'an Jietonda Chemical Co., Ltd. Phase II Project Phased Completion Environmental Protection Acceptance Public Notice

Time: 2019-04-01

According to the "Decision of the State Council on Amending the" Regulations on the Environmental Protection Management of the Completion of Construction Projects "" (State Council Order No. 682) and the Announcement of the Ministry of Environmental Protection on the Issuance of the "Interim Measures for the Environmental Protection Acceptance of Construction Projects" 2017] No. 4), the environmental protection acceptance contents (including monitoring reports and acceptance opinions) of the second phase (phased) completion of Lu'an Jietongda Chemical Co., Ltd. are now publicized as follows:

Project name: Lu'an Jietongda Chemical Co., Ltd. Phase II (phased) completion of environmental protection acceptance

Construction site: Lu'an Jietongda Chemical Co., Ltd. Phase II project is located on Anfeng Road, Chengbei Industrial Park, Jin'an District, on the east side of Phase I project.

Construction unit: Lu'an Jietongda New Material Co., Ltd.

Construction content: The scope of this acceptance includes a crushed and mixed packaging workshop with a construction area of ??1800m2, including three sets of crushing production lines and a set of mixed packaging lines; a liquid raw material warehouse, a building area of ??720m2, and a solid raw material warehouse. , A building area of ??720m2; a comprehensive building with a building area of ??3984m2; supporting pollution prevention facilities.

EIA design crushing and mixing packaging workshop is equipped with 5 sets of crushers and 3 sets of mixers. At present, there are actually 3 sets of shredders and 1 set of mixers. The fire storage pool is built at the reserved warehouse location designed by the EIA, and the reserved warehouse will no longer be built. The dormitory building designed and constructed by the EIA is not yet built and is not within the scope of this acceptance. This acceptance is a staged acceptance.

Public announcement time: April 1, 2019 to April 26, 2019 (20 working days)

Contact: Weng Shibing

Contact phone: 18056405879

Email: wsb@jietondachem.com

During the publicity period, if you have any objections to the above publicity content, please provide written feedback. Individuals must sign their real names and the unit must affix their official seals.

Attachment 2 Opinions on Stage Completion and Acceptance of Jietongda Phase II Project.pdf--Click to view

Attachment 1 Lu'an Jietongda Chemical Co., Ltd. Phase II Environmental Protection Acceptance Report.pdf--Click to view

[ BACK ]

CONTACT US

Contact us

Order

HOTLINE:

+86-564-3711165
+86-13966241417
 

Mobile version

Search

Add: 15 Li Dun, North Outskirts of Luan City, Anhui, P, R, China  P.C.:237158
Tel: +86-564-3711165 , +86-564-3711777
Fax: +86-564-3711167 E-mail: jietonda@jietondachem.com

Copyright(C)2019, Lu'An Jietonda New Material Co.,Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 備案序號:皖ICP備11004581號

泽库县| 开化县| 边坝县| 渑池县| 偃师市| 筠连县| 孟州市| 永新县| 鄯善县| 卢湾区| 盐池县| 贵溪市| 大安市| 沂源县| 莆田市| 兴文县| 青川县| 比如县| 江门市| 黄梅县| 张家口市| 军事| 都匀市| 抚远县| 麻江县| 永宁县| 大关县| 彰化县| 保德县| 江山市| 东阿县| 仁怀市| 永顺县| 若尔盖县| 黎城县| 河北区| 淮滨县| 伊宁市| 洛川县| 哈巴河县| 金沙县|